Works Order Material window will open when the + add button is selected.
Description – description of material
Part No – part number of material
Iss – issue number related to part number
Spec – specification of material
Unit Qty – how much material is required to manufacture one unit?
Plan Qty – quantity to be manufactured
Total Qty – total quantity required
UOM – Unit of Measure
Form – bought in form applied to material
Lead Time (days) – lead time in days of normal supply
Cost – cost of material
Cost Qty – cost quantity of the material
Uplift% – percentage uplift applied to material
Surcharge – surcharge applied e.g. postage/carriage
Adjustment – adjustment of price applied
Total Cost – total cost of the material
Unit Cost – unit cost of the material
Notes – notes applicable to this material
Supplier – default supplier against this material
Recalculate button
OK – saves and closes window
OK & Add – saves and opens material picking list
Cancel – closes window no record saved