Navigate to Data⇒Production⇒Machine
Click New and enter the details of the new Machine/Plant followed by Save
Once saved, the other tabs can be selected and completed as necessary
- Shift Pattern – shows the shift pattern selected on the detail page
- Break Down – allows any breakdowns of the machine/plant to be logged
- Maintenance – allows any maintenace of the machine/plant to be scheduled or logged
- Operation – shows the operations that have been linked to this machine/plant
- Variable Charge Rate – Allows a variable charge rate to be applied to the machine/plant based on preselected criteria